Commonwealth Games Regeneration

Client | Birmingham City Council

Main Contractor | Perry Bar

Timeline | 2019-2023

The Project

Significant road and safety improvements were made around Alexandra Stadium, including the removal of pedestrian underpasses, which were made safe, and the installation of a temporary crossing later replaced with traffic signals featuring fuzzy logic. A bridge mat was installed, with work ongoing 24/7. Additionally, the A34 flyover was demolished, and the materials were stored in a designated compound. Alpha 1 handled all major site-wide earthworks, while the kerbs, edgings, cycleways, footpaths, roads, and most block paving were renewed. Furthermore, all associated drainage work, including pipes and gullies across the site, was also completed.

The highlights